Files
Momento/.agent/skills/wds-8-product-evolution/workflow-deploy.md
Antigravity bd495be965
All checks were successful
Deploy to Production / Build and Deploy (push) Successful in 12s
feat: design system overhaul — sidebar, AI chats, settings, brainstorm, color cleanup
- Sidebar: dynamic brand-accent colors, brainstorm section restyled
- AI chat general: popup panel with expand/collapse, hides when contextual AI open
- AI chat contextual: tabs reordered (Actions first), X close button, height fix
- Settings: all tabs restyled, 6 new color presets (sage, terracotta, iron, etc.)
- Global color cleanup: emerald/orange hardcoded → brand-accent dynamic
- Brainstorm page: orange → brand-accent throughout
- PageEntry animation component added to key pages
- Floating AI button: bg-brand-accent instead of hardcoded black
- i18n: all 15 locales updated with new AI/billing keys
- Billing: freemium quota tracking, BYOK, stripe subscription scaffolding
- Admin: integrated into new design
- AGENTS.md + CLAUDE.md project rules added
2026-05-16 12:59:30 +00:00

2.0 KiB

name, description, borrows_from
name description borrows_from
deploy Create PR and deliver the improvement to the team Phase 4 [H] (design delivery)

Deploy

Goal: Package the tested improvement as a PR and deliver it to the development team.


INITIALIZATION

Design Log

Read {output_folder}/_progress/00-design-log.md. Check Current and Backlog for context.

Steps

Step 1: Pre-Deploy Checklist

Verify everything is ready:

  • All acceptance criteria pass (from [T] test report)
  • Branch is clean (no uncommitted changes)
  • Commits are logical and well-described
  • No unrelated changes included
  • Documentation updated (if applicable)

Step 2: Create Pull Request

Create a PR from the evolution branch:

gh pr create --title "[Improvement]: [Brief description]" --body "..."

PR body includes:

  • What changed — Summary of the improvement
  • Why — Link to scenario and analysis
  • How to test — Steps from the test report
  • Screenshots — Before/after if visual change
  • Acceptance criteria — Checklist from spec

Step 3: Package Delivery Context

Create a delivery summary at {output_folder}/evolution/deliveries/:

# Delivery: [Scenario Name]

## PR
[Link to PR]

## Artifacts
- Analysis: [link]
- Scenario: [link]
- Specification: [link]
- Test Report: [link]

## Change Summary
[What was changed and why]

## Impact
[Expected improvement based on success criteria]

## Monitoring
[What to watch after deployment — metrics, error rates, user feedback]

Step 4: Notify Team

If the project uses design log tracking or team notifications:

  1. Create completion notification
  2. Reference all artifacts (analysis → scenario → spec → test → PR)
  3. Include any monitoring instructions

Step 5: Plan Next Cycle

After deployment:

  1. Archive this improvement cycle
  2. Review remaining improvement targets from [A] analysis
  3. Suggest next target or new analysis round

AFTER COMPLETION

  1. Update design log with completed improvement
  2. Return to Phase 8 Activity Menu for next cycle