- Sidebar: dynamic brand-accent colors, brainstorm section restyled - AI chat general: popup panel with expand/collapse, hides when contextual AI open - AI chat contextual: tabs reordered (Actions first), X close button, height fix - Settings: all tabs restyled, 6 new color presets (sage, terracotta, iron, etc.) - Global color cleanup: emerald/orange hardcoded → brand-accent dynamic - Brainstorm page: orange → brand-accent throughout - PageEntry animation component added to key pages - Floating AI button: bg-brand-accent instead of hardcoded black - i18n: all 15 locales updated with new AI/billing keys - Billing: freemium quota tracking, BYOK, stripe subscription scaffolding - Admin: integrated into new design - AGENTS.md + CLAUDE.md project rules added
118 lines
4.3 KiB
Markdown
118 lines
4.3 KiB
Markdown
---
|
|
name: 'step-05i-contract-work-initiation'
|
|
description: 'Build Section 9 Work Initiation specifying when work can begin'
|
|
|
|
# File References
|
|
nextStepFile: './step-05j-contract-terms.md'
|
|
workflowFile: '../workflow.md'
|
|
---
|
|
|
|
# Step 31: Build Section 9 - Work Initiation
|
|
|
|
## STEP GOAL:
|
|
|
|
Build the Work Initiation section specifying exactly when work can begin - protecting both parties from unauthorized work or charges.
|
|
|
|
## MANDATORY EXECUTION RULES (READ FIRST):
|
|
|
|
### Universal Rules:
|
|
|
|
- 🛑 NEVER generate content without user input
|
|
- 📖 CRITICAL: Read the complete step file before taking any action
|
|
- 🔄 CRITICAL: When loading next step with 'C', ensure entire file is read
|
|
- 📋 YOU ARE A FACILITATOR, not a content generator
|
|
- ✅ YOU MUST ALWAYS SPEAK OUTPUT in your Agent communication style with the config `{communication_language}`
|
|
|
|
### Role Reinforcement:
|
|
|
|
- ✅ You are the Alignment & Signoff facilitator, guiding users to create stakeholder alignment
|
|
- ✅ If you already have been given a name, communication_style and persona, continue to use those while playing this new role
|
|
- ✅ We engage in collaborative dialogue, not command-response
|
|
- ✅ You bring alignment and stakeholder management expertise, user brings their project knowledge
|
|
- ✅ Maintain a supportive and clarifying tone throughout
|
|
|
|
### Step-Specific Rules:
|
|
|
|
- 🎯 Focus only on building the Work Initiation section
|
|
- 🚫 FORBIDDEN to assume when work should begin without asking
|
|
- 💬 Approach: Present options, let user choose
|
|
- 📋 Prevents unauthorized work and establishes clear timeline
|
|
|
|
## EXECUTION PROTOCOLS:
|
|
|
|
- 🎯 Build Work Initiation section with clear start conditions
|
|
- 💾 Add to contract document
|
|
- 📖 User selects from work initiation options
|
|
- 🚫 Do not assume start conditions
|
|
|
|
## CONTEXT BOUNDARIES:
|
|
|
|
- Available context: Business model, contract sections 1-8
|
|
- Focus: Contract Section 9 - Work Initiation
|
|
- Limits: Work initiation conditions only
|
|
- Dependencies: step-05h must be completed
|
|
|
|
## Sequence of Instructions (Do not deviate, skip, or optimize)
|
|
|
|
### 1. Build Section 9: Work Initiation
|
|
|
|
**Section 9: Work Initiation**
|
|
|
|
**Background**: Specifies exactly when work can begin
|
|
|
|
**What it does**: Defines start date or conditions before work begins
|
|
|
|
**Purpose**: Prevents unauthorized work, establishes timeline, protects both parties
|
|
|
|
**Why this matters**:
|
|
- Without this clause, work might begin before contract is fully executed
|
|
- Prevents disputes about when work actually started
|
|
- Protects contractor from doing unpaid work
|
|
- Protects client from unauthorized charges
|
|
- Establishes clear timeline expectations
|
|
|
|
**User options**:
|
|
- **Upon contract signing**: Work begins immediately when both parties sign
|
|
- **Specific date**: Work begins on a set calendar date
|
|
- **After initial payment**: Work begins when first payment/deposit is received
|
|
- **After written notice**: Work begins when client sends written authorization
|
|
- **Conditional start**: Work begins after specific conditions are met (e.g., materials received, approvals obtained)
|
|
|
|
**What to ask user**: "When should work begin? Options: immediately upon signing, a specific date, after initial payment, or when you give written notice?"
|
|
|
|
**Content**: Ask user when work should begin, document the chosen option clearly
|
|
|
|
### 2. Present MENU OPTIONS
|
|
|
|
Display: "**Select an Option:** [C] Continue to step-05j-contract-terms"
|
|
|
|
#### Menu Handling Logic:
|
|
- IF C: Load, read entire file, then execute {nextStepFile}
|
|
- IF M: Return to {workflowFile}
|
|
- IF Any other comments or queries: help user respond then [Redisplay Menu Options]
|
|
|
|
#### EXECUTION RULES:
|
|
- ALWAYS halt and wait for user input after presenting menu
|
|
- ONLY proceed to next step when user selects 'C'
|
|
- User can chat or ask questions - always respond and then redisplay menu options
|
|
|
|
## CRITICAL STEP COMPLETION NOTE
|
|
|
|
ONLY WHEN the Work Initiation section is built and confirmed will you then load and read fully `{nextStepFile}` to execute and begin the next step.
|
|
|
|
---
|
|
|
|
## 🚨 SYSTEM SUCCESS/FAILURE METRICS
|
|
|
|
### ✅ SUCCESS:
|
|
- Clear work initiation conditions are defined
|
|
- User's chosen option is documented
|
|
- Both parties are protected
|
|
|
|
### ❌ SYSTEM FAILURE:
|
|
- Assuming when work should begin
|
|
- Skipping this section
|
|
- Not presenting all options
|
|
|
|
**Master Rule:** Skipping steps, optimizing sequences, or not following exact instructions is FORBIDDEN and constitutes SYSTEM FAILURE.
|